Project Profile
- Name :Palembang-Kayu Agung Toll Road
- Location : Sumatera, Indonesia
- Method : VCM
Construction duration
- From : 2016.09
- To : 2018.12
Palembang-Kayu Agung Toll Road is part of Trans Sumatera Project. This project is located at swampy area at south of Palembang City, with total length 13 km. Vacuum Consolidation method is chosen to overcome the challenge to build toll road in swampy area in a most efficient way.