Project Profile
- Name : Ningbo International Finance Centre
- Location : Ningbo City in China
- Method : Diaphragm wall and reinforced concrete strut
Construction duration
- From : 2009.05
- To : 2010.12
The area is 45000m2 in this project with three storey basements. The general excavation depth varies from 16.2m2 to 19.2m2, and the maximum depth is up to 24m2. The project is located at a soft mud soil layer with a complicated engineering geological condition. Surrounding environment is very complex with many buildings, municipal pipelines near foundation pit. We overcome the constraints of complex surrounding environment conditions and restrictions to make sure excavation displacement is less than 40mm by using diaphragm wall and concrete strut.