Piles Engineering Project for C360-LRT Phase-1

Project Profile
  • Name : Vacuum preloading & PVD Installation works in terminal 5
  • Location : Changi International Airport, Singapore
  • Method : VCM
Construction duration
  • From : 2015.01
  • To : 2018.06