Project Profile
- Name : Vacuum preloading & PVD Installation works in terminal 5
- Location : Changi International Airport, Singapore
- Method : VCM
Construction duration
- From : 2015.01
- To : 2018.06
The terminal 5 project of Singapore Changi Airport covers an area of around 25 hectares, and the depth of some part of the foundation is about 60 m. After replacing the previous technology of Cement Mixing Piling with Vacuum Consolidation Method(VCM), we helped save about 2 billion RMB and reduced 300, 000 tons of CO2 emission (equals to the total annual emission of about 600, 000 cars)